Mr.Lim engage me after browsing through this website and meeting me up to discuss the details of the pond. The project is located in a industrial area in Balakong which is the new location of their factory. They required a more bright Balinese Feature with 3 levels of water. I really feel honored to be able to get to know Mr.Lim and his mom, both very kind and understanding people. The structure of the pond is fully concrete as to support the vibration and movement of the industrial area.
Front view of overall pond with Palimantan Stones, Pebblewash and stone cladding.
Overall view of the pond with water sound quality..
Comments
Post a Comment